Quality and Welding Inspections for Water Corporations Beenyup Advanced Wastewater Recycling Plant

Quality and Welding Inspections for Water Corporations Beenyup Advanced Wastewater Recycling Plant


We are proud to have been involved with Water Corporations Beenyup Advanced Wastewater Recycling Plant where Elite Engineering WA has handled the QA documentation and Inspections for the Welded Structures.

The Advanced Water Recycling Plant will have the capacity to recycle up to 28 billion litres a year, with half of this water recharging the Leederville and Yarragadee Aquifers onsite and the remaining volume of water being transferred to recharge bores drilled in Wanneroo and Neerabup.

The project involved:

  • 238.9 tonnes of welded steelwork
  • 2352 welded items
  • 5442 metres of weld

Elite Engineering WA`s scope included:

  • Full Welding Inspection
    • 100% visual scanning
    • 10% visual examination
  • Creating, Completing and Compiling Quality Documentation
    • Welding Procedures
    • Welder Qualifications
    • Fabrication Registers
    • Full Welding Traceabilty for every item
    • Material Certifications
    • Consumable Certifications
    • Non-Destructive testing requests
    • Coating reports for galvanised items

If you would like more information on how Elite Engineering WA can help you with your next project please contact us for a quote or more information.
Email sales@elitewa.com.au or Phone 1300 887 461




Tags:

Welding Inspection, Welding Documentation, Visual Weld Inspection Perth



Return to Projects Page